ROUTE SURVEY OF ROAD AND PAVEMENT DESIGN (REHABILITATION/MODERNIZATION)
Sold By: Joe Project Store | Item Type: Project Material | Report this? | Attributes: 65 pages | 1-5 chapters | Amount: ₦5,000 | 10 orders. | Marked useful: 10,176 times
INSTANT PROJECT MATERIAL DOWNLOADThe study cover a view and a detailed explanation of the modification required to be carried out on the main access road linkage of the Campus III Industrial center from federal Secretariat to Mass Communication Department of the Institution in order to update its services and functions.
The need for easing the flow of traffic on this access road shall rise, since it s a commercial center in the institution. It is required that the toad be revamped and generally upgraded. The existing road is no longer in peak condition and a result of traffic growth.
The study modification therefore involves the assessment of the roads present condition, involving carrying out side test, and surveys etc, as to what could be done and how best to enhance traffic flow.
Certification
Dedication
Abstract
Acknowledgement
Table of content
CHAPTER ONE
General introduction
Design application
Aim and objective
Advantages of road
Reconnaissance survey
Route survey
CHAPTER TWO
Theodolite transversing of the road control
Importance of theodoversing
Equipment used on traversing
Procedure
Conversion of angles to bearing (whole area bearing
Rectangular co-ordinate
CHAPTER THREE
Field leveling work general survey
Need for preliminary survey leveling work
Technical term used in leveling
Aim
Application of leveling
Instrument in leveling’
Operation condition’’
Leveling of the road
Reduction of filed data
Brief description on profile and cross sectional leveling
Uses of profile plot
Leveling tabulating
Earth work computation
CHAPTER FOUR
Soil identification/laboratory test
Soil identification
Laboratory test performed in soil
Test to be carried out
Soil sampling
Sieve/particles size analysis
Aim and scope
Material and equipment
Test producers
Constancy limits
Liquid limit of soil
Objective and scope
Material and equipment
Test procedure
Plasticity index
Soil classification based in plasticity
Significance fo the study
Compaction
Objective and scope
Materials and equipment
Test procedure
California bearing ratio (cbr)
Objective scope
Material and equipment
Test procedure
Borrow materials for sub-base
Laboratory test on the borrowed materials
Cbr rating
Tabulation for mechanical analysis
CHAPTER FIVE
Design vehicles
Design speed
Highway capacity
Deign guide
Design period
Basic design element horizontal alignment
Vertical alignment
Vertical curvature
Standard for grade
Co-ordination of vertical and horizontal alignment
Deign of curves
Pavement layers
Pavement design
Design facts the engineer should know for design
Preparation
Pavement widening
Pavement material
Component pavement and their functions
Design of road pavement
Calculation of cbr value
Vertical and horizontal curve design
Design procedure
Services life of pavement
Drainage design
Basic policy on drainage design
Road side drainage channels
Erosion protection
Conclusion and recommendation
Reference
This material content is developed to serve as a GUIDE for students to conduct academic research
DOWNLOAD THIS PROJECT MATERIAL NOW!
Advertise Here
Not what you were looking for? Perform a search
What's your project topic?
Comment on Facebook:
Related Project Materials
- 1.
COMPARATIVE ANALYSIS OF THE STRENGTH OF CONCRETES MADE FROM VARIOUS AGGREGATE
COMPARATIVE ANALYSIS OF THE STRENGTH OF CONCRETE MADE FROM VARIOUS AGGREGATE CHAPTER ONE INTRODUCTION This work was to present in one weight, the fund...More »
Item Type: Project Material | 52 pages | 4,699 engagements |
- 2.
BUILDING COST MANAGEMENTS
CHAPTER ONE INTRODUCTION 1.1 Background to the Study Approaches to the total cost management of construction works are now changing rapid...More »
Item Type: Project Material | 53 pages | 3,923 engagements |
- 3.
AWARENESS AND PRACTICES OF GREEN CONSTRUCTION
AWARENESS AND PRACTICE OF GREEN CONSTRUCTION CHAPTER ONE INTRODUCTION 1.1 Background to study. Green or Sustainable buildings are the future and w...More »
Item Type: Project Material | 60 pages | 3,762 engagements |
- 4.
EFFECT OF THE USE OF SUB-STANDARD MATERIALS ON BUILDING CONSTRUCTION (CASE STUDY OF MINISTRY OF HOUS...
EFFECT OF THE USE OF SUB STANDARD MATERIALS ON BUILDING CONSTRUCTION (CASE STUDY OF MINISTRY OF HOUSING, LAGOS STATE) CHAPTER ONE INTRODUCTION 1.1 ...More »
Item Type: Project Material | 53 pages | 5,990 engagements |
- 5.
BUILDING COLLAPSE : A CHALLENGE FOR THE REAL ESTATE INDUSTRY AND CONSTRUCTION COMPANIES IN NIGERIA
CHAPTER ONE INTRODUCTION 1.1 Background of the study Incidences of the fall of buildings in Nigeria are posing major concerns and challenge to all ...More »
Item Type: Project Material | 53 pages | 4,273 engagements |
- 6.
EFFECTIVENESS OF QUALITY ASSURANCE STRATEGIES IN PROJECT EXECUTION (A STUDY OF ROAD CONSTRUCTION PR...
EFFECTIVENESS OF QUALITY ASSURANCE STRATEGIES IN PROJECT EXECUTION (A STUDY OF ROAD CONSTRUCTION PROJECTS IN OWERRI) CHAPTER ONE INTRODUCTION 1.1 Back...More »
Item Type: Project Material | 51 pages | 11,055 engagements |