ABSTRACT
The 200W solar system was determined by load assessment, solar panel number determination, battery requirement and then inverter sizing. A complete solar panel rated at 200w was however purchased, together with 2 no. 150A solar battery, 1500W inverter and also 10A charge controller. These were assembled together with necessary protective gadgets like cut out switches; to give the 200W expected. The solar panel was mounted outside the building to allow for maximum collection of sun energy. It is expected that the system will help the department meet up with its office duties even when central power is not available.
CHAPTER ONE
INTRODUCTION
1.1 NEED FOR THE PROJECT
The general objective of the system is to provide efficiency, steadiness in the use of power appliances, by ensuring continuous availability of power supply even in the absence of mains. Uninterruptability of the system made it possible to eliminate all suspense from mains outage during the execution of an important and urgent assignment as may be required.
For better production of the system, the system was operated at a fully charged condition of the battery.
The project was rated 200W of 220V and 50Hz. It was expected that at this condition, it was favourable to carry load of the stipulated power. Loads of low power factors are not helpful since they produce spikes. Overloading is not potent to provide zero change over time and the inverter had LEDs which indicates mains failure and battery discharge and system fault.
1.2 SCOPE OF STUDY
This solar power source makes it possible to provide a clean reliable supply of alternative electricity free of sags or surges which could be found in the line voltage frequency.
The solar power system (SPS) system achieved this by direct current from solar panel and by rectifying the standard main supply, using the direct current to charge the batteries and to provide clean alternative power by passing the energy a filter system.
It has zero change over time and LEDs which indicates mains fail and battery discharge level and it provides 100% protection against line noise, spikes surges and audio frequency interference.
1.3 DEFINITION OF TERMS
1. Inverter unit: This unit converts a DC voltage into AC voltage with the help of the inverter unit.
2. Automatic Control Unit: This provides all the required control needed to meet up the objective of the whole system
3. Battery Unit: This is a secondary cell unit, capable of storing enough DC voltage from either sun or AC main, of which is later converted to AC voltage.
This material content is developed to serve as a GUIDE for students to conduct academic research
DOWNLOAD THIS PROJECT MATERIAL NOW!
Advertise Here
Not what you were looking for? Perform a search
What's your project topic?
Comment on Facebook:
Related Project Materials
- 1.
EFFECT OF INFLATION ON SOCIOECONOMIC STATUS OF HOUSEHOLD IN NIGERIA
CHAPTER ONE INTRODUCTION Background of the Study Globally, high inflation continues to be a significant unresolved matter. It is a prominent concer...More »
Item Type: Project Material | 54 pages | 1,930 engagements |
- 2.
AN ASSESSMENT INTO THE EFFECT OF FEDERAL STUDENT LOAN DEFAULT RATES: IMPLICATION FOR THE NIGERIAN EC...
CHAPTER ONE INTRODUCTION Background of the study The higher education system in Nigeria has seen significant growth in recent decades, with a risin...More »
Item Type: Project Material | 54 pages | 1,512 engagements |
- 3.
AN EXAMINATION OF THE CAUSES AND EFFECTS OF ECONOMIC MELTDOWN IN NIGERIA (AN ASSESSMENT OF TINUBU AD...
CHAPTER ONE INTRODUCTION Background of the Study Economic meltdown, sometimes known as an economic crisis, can be described as a state of economic slo...More »
Item Type: Project Material | 54 pages | 1,929 engagements |
- 4.
AN EXAMINATION OF THE EFFECTS OF ECONOMIC STAGNATION ON NIGERIA ECONOMIC GROWTH AND DEVELOPMENT (A C...
CHAPTER ONE INTRODUCTION Background of the Study It is well acknowledged by all citizens that Nigeria and other countries are currently experiencing a...More »
Item Type: Project Material | 54 pages | 1,708 engagements |
- 5.
AN IN-DEPTH INVESTIGATION OF THE IMPLICATIONS OF ECONOMIC STAGNATION ON THE LIVELIHOOD OF RURAL DWEL...
AN IN DEPTH INVESTIGATION OF THE IMPLICATIONS OF ECONOMIC STAGNATION ON THE LIVELIHOOD OF RURAL DWELLERS CHAPTER ONE INTRODUCTION Background of the St...More »
Item Type: Project Material | 54 pages | 1,583 engagements |
- 6.
AN IN-DEPTH STUDY OF WIDESPREAD HARDSHIP IN NIGERIA(AN EXPERIENCE UNDER TINUBU ADMINISTRATION)
AN IN DEPTH STUDY OF WIDESPREAD HARDSHIP IN NIGERIA(AN EXPERIENCE UNDER TINUBU ADMINISTRATION) CHAPTER ONE INTRODUCTION Background of the Study The...More »
Item Type: Project Material | 54 pages | 1,808 engagements |